WTNS logo
iOS · Photo journaling

WTNS: the iOS app for capturing & tracking change.

Track anything that transforms over time, one perfectly aligned photo at a time. Some changes happen slowly; that's exactly why they're worth capturing.

No account needed. Everything stays on your device.
An iPhone held in one hand, cycling through WTNS: the records grid, a hair regrowth record, its progress chart, and a scrub through the time-lapse
1

Track change precisely, with overlay photo technology

Cactus at month 1 Cactus at month 4 Cactus at month 7 Cactus at month 10 Cactus at month 12
Ghost overlay · Month 1
Height tracked 2 cm
Month 1

Playing. Drag the slider any time to take over.

2

Add data points and notes beside every photo, so you know why something changed.

A photo shows you that something changed. The number you logged and the note you wrote that week tell you what caused it: the new product, the higher dose, the fortnight you skipped. Say goodbye to placebos.

Skin confidence journey New retinoid routine · 9 months
Self-consciousness Happiness
0255075100StartM1M2M3M4M5M6M7M8M9

Self-consciousness started high and happiness low. Nine months on, with the real dips and setbacks along the way, the lines have crossed. That's the story the photos alone can't tell you.

Tap a metric to plot a different journey

+ your own metric
Download on theApp Store

Start tracking any metric, free on the App Store.

3

Need a second opinion? Export your record as a PDF.

Everything you captured, laid out as a clean document: the photos in order, the date on each one, the metrics you logged and the note you wrote at the time. Hand it to a dentist, a dermatologist, a contractor, or the friend who keeps asking how it's going.

  • Export all photos in sequence to show progress
  • Include your custom notes, or remove them
  • Add your metrics and data logging, or remove them
  • Share it however you like; AirDrop, message, email, print and more

Nothing leaves your iPhone until you choose to send it.

A4 PDF
An exported WTNS record as a three page A4 PDF: a progress chart of hair coverage over two years, then the dated photos with their metric readings and notes
A few of the journeys worth keeping

If it changes,
you can witness it.

Anything that changes visually counts: the results of your new whitening toothpaste, a hair loss and regrowth journey, a baby bump, or simply the view from your window turning through the seasons. WTNS can witness it all.

Track a breakout back to calm with a consistent, well-lit frame, then log clarity, mood, and what you changed alongside each shot so you can see what actually worked.

Clarity4.6 ▲ 2.8
Mood😊 4/5
RoutineRetinoid
Skin tracking, day 1Day 1
Skin tracking, day 21Day 21
Skin tracking, day 42Day 42
Skin tracking, day 63Day 63
Skin tracking, day 84Day 84

Snap the same frame once a month and the year compresses into a few seconds. Log height and waterings so growth spurts line up with what you did.

Height18 cm ▲ 11
Waterings14
IntervalMonthly
Cactus, month 1Month 1
Cactus, month 4Month 4
Cactus, month 7Month 7
Cactus, month 10Month 10
Cactus, month 12Month 12

Document a renovation from the same corner and keep budget, contractor notes, and satisfaction next to every stage, so the before/after tells the whole story, cost included.

Spent£11.4k
Satisfaction⭐ 5/5
StageComplete
Kitchen renovation, week 1Week 1
Kitchen renovation, week 2Week 2
Kitchen renovation, week 4Week 4
Kitchen renovation, week 5Week 5
Kitchen renovation, week 6Week 6
Privacy-first, by design

Your change is personal.
It stays that way.

Everything lives on your device, protected by Face ID. No account, no cloud sync required, no third-party sharing.

Face ID / Touch ID lockAuto-lock from immediate to 5 minutes.
Local photo storageNo cloud required. Optional Camera Roll backup.
No account neededOpen the app and start. Nothing to sign up for.
Private, lockable recordsHide individual records behind Face ID, so previews never show on the home screen.
An iPhone held in one hand showing the WTNS lock screen, with the app icon above a padlock
Download on theApp Store

No account. No cloud. Just your iPhone.

Built for the long game

Everything you need to document change honestly.

The photo is only half the story. WTNS keeps the numbers, the feelings, and the context right beside it.

Line up your shot with a semi-transparent overlay of your last photo; opacity runs from 0 to 100%, with an optional grid for composition. No more guessing, no more crooked comparisons. It's what makes every before/after land.

Weight, cost, size, mood, sleep: 30+ presets, or build your own. Photos tell part of the story; metrics capture how you felt and what it took.

Your sequence becomes a video automatically. Adjust speed from 0.5× to 4×, then export and share the whole journey.

Leave a note beside any frame: what you changed, what it cost, what threw the numbers off. Context you'll be grateful for later.

Daily, weekly, or custom intervals with morning, afternoon, or evening preferences. Consistency, without the nagging.

An iPhone held in two hands, showing a WTNS record charting whitening progress over eight weeks
Pricing

Start free. Stay free if that suits you.

Your first record and your first five photos are free forever. Don't like it, don't pay. Only ever need five photos? It's yours.

Free

$0free forever

No trial countdown and no card required. Keep it as long as you like.

  • Your first record
  • Up to five photos
  • Ghost overlay alignment
  • Custom metrics and charts
  • Face ID locking
  • No account, ever
Download WTNS

Prices shown in USD; your local App Store price may differ. Subscriptions are billed through your Apple Account and renew automatically until cancelled, which you can do at any time in your iPhone settings. See the Terms of Service for full details.

One app, countless journeys

What will you WTNS?

If it changes visually, WTNS can track it.
A few of the ways people use it.

Fitness journey

Home renovation

Child development

Mental wellness

Baby bump

DIY builds

Seasonal changes

Muscle gain

Nail growth

Pet growth

Recovery & healing

Sourdough starter

Skin transformation

Plant growth

Beard & hair growth

Creative projects

Baby growth

New products

Weight loss

Hair colour

Tattoo healing

Garden seasons

Braces progress

Travel & places

Start the record you'll be glad you kept.

Free to download. Everything stays on your iPhone.

Download on theApp Store
An iPhone held in one hand showing a WTNS record: four dated photos of a whitening journey, each tagged with its whiteness score